{"id":624,"date":"2019-01-28T19:27:09","date_gmt":"2019-01-28T18:27:09","guid":{"rendered":"https:\/\/site.uit.no\/arcticgreen\/?p=624"},"modified":"2019-01-28T19:27:09","modified_gmt":"2019-01-28T18:27:09","slug":"simula-signs-contract-with-nextron-as-for-the-delivery-of-the-first-procurement-to-the-ex3-infrastructure","status":"publish","type":"post","link":"https:\/\/site.uit.no\/arcticgreen\/simula-signs-contract-with-nextron-as-for-the-delivery-of-the-first-procurement-to-the-ex3-infrastructure\/","title":{"rendered":"Simula signs contract with Nextron AS for the delivery of the first procurement to the eX3 infrastructure"},"content":{"rendered":"<p>Simula, the coordinator of our national research infrastructure project eX3, has signed contract with Nextron AS\u00a0for the delivery of the first procurement to the eX3 infrastructure. The delivery of equipment is expected in late February\/ early March.<\/p>\n<p><a href=\"https:\/\/www.simula.no\/news\/simula-signs-contract-nextron-delivery-first-procurement-ex3-infrastructure\">Detailed information about the equipment<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<iframe src=\"http:\/\/www.facebook.com\/plugins\/like.php?href=https%3A%2F%2Fsite.uit.no%2Farcticgreen%2Fsimula-signs-contract-with-nextron-as-for-the-delivery-of-the-first-procurement-to-the-ex3-infrastructure%2F&amp;layout=standard&amp;show_faces=true&amp;width=450&amp;action=like&amp;colorscheme=light&amp;height=80\" scrolling=\"no\" frameborder=\"0\" style=\"border:none; overflow:hidden; width:450px; height:80px;\" allowTransparency=\"true\"><\/iframe>","protected":false},"excerpt":{"rendered":"<p>Simula, the coordinator of our national research infrastructure project eX3, has signed contract with Nextron AS\u00a0for the delivery of the first procurement to the eX3 infrastructure. The delivery of equipment is expected in late February\/ early March. Detailed information about &hellip; <a href=\"https:\/\/site.uit.no\/arcticgreen\/simula-signs-contract-with-nextron-as-for-the-delivery-of-the-first-procurement-to-the-ex3-infrastructure\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":308,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-624","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/posts\/624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/users\/308"}],"replies":[{"embeddable":true,"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/comments?post=624"}],"version-history":[{"count":3,"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/posts\/624\/revisions"}],"predecessor-version":[{"id":627,"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/posts\/624\/revisions\/627"}],"wp:attachment":[{"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/media?parent=624"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/categories?post=624"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/site.uit.no\/arcticgreen\/wp-json\/wp\/v2\/tags?post=624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}