{"id":311,"date":"2020-04-14T12:33:40","date_gmt":"2020-04-14T10:33:40","guid":{"rendered":"https:\/\/site.uit.no\/grab\/?p=311"},"modified":"2021-11-02T12:31:05","modified_gmt":"2021-11-02T11:31:05","slug":"delay-in-construction-works","status":"publish","type":"post","link":"https:\/\/site.uit.no\/grab\/2020\/04\/14\/delay-in-construction-works\/","title":{"rendered":"Delay in construction works"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"311\" class=\"elementor elementor-311\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-11f25333 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"11f25333\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1142108c\" data-id=\"1142108c\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-644b706e elementor-widget elementor-widget-text-editor\" data-id=\"644b706e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\tDue to the current corona situation, some tasks\/works in KO1089 GrAB are delayed. In particular, the erection of our demonstration buildings in Russia is affected (work package 3). They were supposed to be finished by September, but we now see that this will not be possible. Hence, we are changing the time line for the construction works to November 2020.\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Due to the current corona situation, some tasks\/works in KO1089 GrAB are delayed. In particular, the erection of our demonstration buildings in Russia is affected (work package 3). They were supposed to be finished by September, but we now see that this will not be possible. Hence, we are changing the time line for the &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/site.uit.no\/grab\/2020\/04\/14\/delay-in-construction-works\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Delay in construction works&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1129,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-311","post","type-post","status-publish","format-gallery","hentry","category-news","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/posts\/311","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/users\/1129"}],"replies":[{"embeddable":true,"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/comments?post=311"}],"version-history":[{"count":5,"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/posts\/311\/revisions"}],"predecessor-version":[{"id":417,"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/posts\/311\/revisions\/417"}],"wp:attachment":[{"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/media?parent=311"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/categories?post=311"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/site.uit.no\/grab\/wp-json\/wp\/v2\/tags?post=311"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}